Solutions for ▼

❉ ┃   CLARIFIERS ❉ ┃   FILTERS & VESSELS ❉ ┃   MEMBRANES ❉ ┃   DE-IONISERS
  SEWAGE TREATMENT
    ✶   STP by MBR

HICLEAR STP ▴ Basement Installation


Technical Details

■   Length of Tank: 5.8m or 11.8m,
■   Dia of cylindrical part: 2.1m,
■   Material of construction: FRP,
■   No. of Inlet connections: 2 (1 for Sewage, 1 for Air),
■   No. of Outlet connections: 2 (1 for Sewage, 1 for Excess Sludge),
■   External Equipment Requirement: Sewage Pumps & Air Blowers (generating low pressure differential of 0.35 bar max.),
■   Foundation requirement: Compacted earth or Concrete Floor or Structural Steel Joists. No need for anchoring, the tanks are rested on their own pedestals.

Special Features...

■   No Sludge handling,
■   Lesser number of rotating equipments,
■   No moving parts inside STP tanks,
■   Lesser amount of Civil/ construction work involved,
■   Minimal requirement of chemicals.

HICLEAR STP ▴ Flexible Installation ▾

HICLEAR STP